FCR - Federal Construction Regulations Collection
This collection contains documents from the following standards organization(s): Federal Aviation Administration, U.S. Department of Commerce, Consumer Product Safety Commission, Food and Drug Administration (Medical Products Quality Assurance), U.S. Department of Transportation, Dept of Housing & Urban Development, U.S. Department of Housing and Urban Development, U.S. Department of Labor, Code of Federal Regulations, Architectural & Transportation Barriers Compliance
| 11 AF ETL 01-1 | EN-RELIABILITY AND MAINTAINABILITY (R&M) DESIGN CHECKLIST | |
| 11 AF ETL 01-13 | EN-SMALL ARMS RANGE DESIGN AND CONSTRUCTION | |
| 11 AF ETL 01-15 | EN-PROGRAMMING FUELS PROJECTS | |
| 11 AF ETL 01-18 | EN-FIRE PROTECTION ENGINEERING CRITERIA - ELECTRONIC EQUIPMENT INSTALLATIONS | |
| 11 AF ETL 01-4 | EN-FIRE PROTECTION ENGINEERING CRITERIA - PROTECTIVE AIRCRAFT SHELTERS (PAS) | |
| 11 AF ETL 01-5 | EN-JET ENGINE THRUST STANDOFF REQUIREMENTS FOR AIRFIELD ASPHALT EDGE PAVEMENTS | |
| 11 AF ETL 01-6 | EN-CONTINGENCY AIRFIELD PAVEMENT SPECIFICATIONS | |
| 11 AF ETL 01-7 | EN-LARGE AGGREGATE ASPHALT MIXTURES | |
| 11 AF ETL 01-8 | EN-RESIN MODIFIED PAVEMENT (RMP) DESIGN AND APPLICATION CRITERIA | |
| 11 AF ETL 01-9 | EN-PROCEDURES TO RETARD REFLECTIVE CRACKING | |
| 11 AF ETL 02-09 | EN-CONSTRUCTION SIGNS FOR MILITARY CONSTRUCTION (MILCON) PROJECTS | |
| 11 AF ETL 02-12 | EN-COMMUNICATIONS AND INFORMATION SYSTEM CRITERIA FOR AIR FORCE FACILITIES | |
| 11 AF ETL 02-13 | EN-PAVEMENT ENGINEERING ASSESSMENT STANDARDS | |
| 11 AF ETL 02-14 | EN-DETERMINING THE NEED FOR RUNWAY RUBBER REMOVAL | |
| 11 AF ETL 02-7 | EN-PREVENTING CONCRETE DETERIORATION UNDER B-1 AND F/A-18 AIRCRAFT | |
| 11 AF ETL 82-2 | EN-ENERGY EFFICIENT EQUIPMENT | |
| 11 AF ETL 83-1 | EN-HQ US AIR FORCE STANDARDIZED HEATING VENTILATING AND AIR CONDITIONING SYSTEMS (HVAC) CONTROL SYSTEMS | |
| 11 AF ETL 83-1 CHANGE 1 | EN-HQ US AIR FORCE STANDARDIZED HEATING VENTILATING AND AIR CONDITIONING SYSTEMS (HVAC) CONTROL SYSTEMS | |
| 11 AF ETL 83-3 | EN-INTERIOR WIRING SYSTEMS AFM 88-15 PARA 7-3 | |
| 11 AF ETL 83-8 | EN-USE OF AIR-TO-AIR UNITARY HEAT PUMPS | |
| 11 AF ETL 83-9 | EN-INSULATION | |
| 11 AF ETL 84-7 | EN-MCP ENERGY CONSERVATION INVESTMENT PROGRAM (ECIP) | |
| 11 AF ETL 86-10 | EN-ANTITERRORISM PLANNING AND DESIGN GUIDANCE | |
| 11 AF ETL 86-14 | EN-SOLAR APPLICATIONS | |
| 11 AF ETL 86-16 | EN-DIRECT DIGITAL CONTROL (DDC) OF HEATING VENTILATION AND AIR CONDITIONING (HVAC) SYSTEMS | |
| 11 AF ETL 86-4 | EN-PAINTS AND PROTECTIVE COATINGS | |
| 11 AF ETL 86-5 | EN-FUELS USE CRITERIA FOR AIR FORCE CONSTRUCTION | |
| 11 AF ETL 86-8 | EN-AQUEOUS FILM FORMING FOAM (AFFF) WASTE DISCHARGE RETENTION AND DISPOSAL | |
| 11 AF ETL 86-9 | EN-LODGING FACILITY DESIGN GUIDE | |
| 11 AF ETL 87-1 | EN-LEAD BAN REQUIREMENTS OF DRINKING WATER | |
| 11 AF ETL 87-2 | EN-VOLATILE ORGANIC COMPOUNDS | |
| 11 AF ETL 87-9 | EN-PREWIRING | |
| 11 AF ETL 88-2 | EN-PHOTOVOLTAIC APPLICATIONS | |
| 11 AF ETL 88-3 | EN-DESIGN STANDARDS FOR CRITICAL FACILITIES | |
| 11 AF ETL 88-4 | EN-RELIABILITY AND MAINTAINABILITY (R&M) DESIGN CHECKLIST | |
| 11 AF ETL 88-6 | EN-HEAT DISTRIBUTION SYSTEMS OUTSIDE OF BUILDINGS | |
| 11 AF ETL 88-9 | EN-RADON REDUCTION IN NEW FACILITY CONSTRUCTION | |
| 11 AF ETL 89-04 | EN-SYSTEMS FURNITURE GUIDE SPECIFICATION | |
| 11 AF ETL 89-2 | EN-STANDARD GUIDELINES FOR SUBMISSION OF FACILITY OPERATING AND MAINTENANCE MANUALS | |
| 11 AF ETL 89-7 | EN-DESIGN OF AIR FORCE COURTROOMS | |
| 11 AF ETL 90-09 | EN-FIRE PROTECTION ENGINEERING CRITERIA FOR AIRCRAFT MAINTENANCE SERVICING AND STORAGE FACILITIES | |
| 11 AF ETL 90-09-A | EN-COMMISSIONING OF HEATING VENTILATING AND AIR-CONDITIONING (HVAC) SYSTEMS GUIDE SPECIFICATION | |
| 11 AF ETL 90-1 | EN-BUILT-UP ROOF (BUR) REPAIR/REPLACEMENT GUIDE SPECIFICATION | |
| 11 AF ETL 90-10 | EN-COMMISSIONING OF HEATING VENTILATING AND AIR-CONDITIONING (HVAC) SYSTEMS GUIDE SPECIFICATIONS | |
| 11 AF ETL 90-2 | EN-GENERAL POLICY FOR PREWIRED WORKSTATIONS AND SYSTEMS FURNITURE | |
| 11 AF ETL 90-3 | EN-TEMPEST PROTECTION FOR FACILITIES | |
| 11 AF ETL 90-5 | EN-FUEL AND LUBE OIL BULK STORAGE CAPACITY FOR EMERGENCY GENERATORS | |
| 11 AF ETL 90-7 | EN-AIR FORCE INTERIOR DESIGN POLICY | |
| 11 AF ETL 90-8 | EN-ETHYLENE PROPYLENE DIENE MONOMER (EPDM) ROOFING GUIDE SPECIFICATION FOR | |
| 11 AF ETL 91-01 | EN-FIRE PROTECTION ENGINEERING CRITERIA TESTING HALON FIRE SUPPRESSION SYSTEMS | |
| 11 AF ETL 91-2 | EN-HIGH ALTITUDE ELECTROMAGNETIC PULSE (HEMP) HARDENING IN FACILITIES | |
| 11 AF ETL 91-4 | EN-SITE SELECTION CRITERIA FOR FIRE PROTECTION TRAINING AREAS | |
| 11 AF ETL 91-6 | EN-CATHODIC PROTECTION | |
| 11 AF ETL 91-7 | EN-CHLOROFLUOROCARBON (CFC) LIMITATION IN HEATING VENTILATING & AIR CONDITIONING (HVAC) SYSTEMS | |
| 11 AF ETL 93-2 | EN-DORMITORY CRITERIA FOR HUMID AREAS | |
| 11 AF ETL 93-3 | EN-INVENTORY SCREENING PRIORITIZATION AND EVALUATION OF EXISTING BUILDINGS FOR SEISMIC RISK | |
| 11 AF ETL 94-01 | EN-STANDARD AIRFIELD PAVEMENT MARKING SCHEMES | |
| 11 AF ETL 94-2 | EN-UTILITY METERS IN NEW AND RENOVATED FACILITIES | |
| 11 AF ETL 94-4 | EN-ENERGY USAGE CRITERIA FOR FACILITIES IN THE MILITARY CONSTRUCTION PROGRAM | |
| 11 AF ETL 94-6 | EN-FIRE PROTECTION ENGINEERING CRITERIA - REMOVAL OF HALOGENATED AGENT FIRE SUPPRESSION SYSTEMS | |
| 11 AF ETL 94-8 | EN-DESIGN IN METRIC | |
| 11 AF ETL 94-9 | EN-SILICONE JOINT SEALANTS FOR PAVEMENTS | |
| 11 AF ETL 95-1 | EN-HALON 1301 MANAGEMENT PLANNING GUIDANCE | |
| 11 AF ETL 95-2 | EN-PREPARATION OF REQUIREMENTS AND MANAGEMENT PLAN (RAMP) PACKAGES FOR MILITARY CONSTRUCTION (MILCON) PROGRAM PROJECTS | |
| 11 AF ETL 95-3 | EN-PLANNING GUIDE FOR INSTALLATION OF ULTRA-HIGH- MOLECULAR-WEIGHT (UHMW) POLYETHYLENE PANELS UNDER AIRCRAFT ARRESTING SYSTEM CABLES (CONUS INSTALLATIONS) | |
| 11 AF ETL 95-4 | EN-MANDATORY ENERGY/WATER PERFORMANCE STANDARDS FOR REPLACED OR MODIFIED EQUIPMENT | |
| 11 AF ETL 96-1 | EN-FIRE PROTECTION ENGINEERING CRITERIA - NEW AIRCRAFT FACILITIES | |
| 11 AF ETL 96-1 ERRATA | EN-FIRE PROTECTION ENGINEERING CRITERIA - NEW AIRCRAFT FACILITIES | |
| 11 AF ETL 96-2 | EN-ELIMINATION OF LIQUID POLYCHLORINATED BIPHENYLS (PCBS) PRIORITIZATION GUIDANCE | |
| 11 AF ETL 96-3 | EN-TYPICAL STATEMENT OF WORK FOR AIRFIELD PAVEMENT CONDITION SURVEY | |
| 11 AF ETL 96-4 | EN-TEMPORARY JOINT SEALING DETAILS AND PROCEDURES FOR PAVEMENTS | |
| 11 AF ETL 96-5 | EN-HANGAR CONCRETE FLOOR REFLECTIVE COATING CRITERIA | |
| 11 AF ETL 97-1 | EN-NATIONAL PRIMARY DRINKING WATER REGULATIONS: LEAD AND COPPER RULE(LCR) CORROSION CONTROL DESK- TOP REPORT STATEMENT OF WORK(SOW) | |
| 11 AF ETL 97-13 | EN-DORMITORY VENTILATION AND EXHAUST SYSTEM DESIGN CRITERIA | |
| 11 AF ETL 97-14 | EN-PROCEDURES FOR AIRFIELD PAVEMENT CONDITION INDEX SURVEYS | |
| 11 AF ETL 97-16 | EN-PAVEMENT MARKING SYSTEM FOR LOW TEMPERATURE APPLICATIONS | |
| 11 AF ETL 97-17 | EN-GUIDE SPECIFICATION - PAINT AND RUBBER REMOVAL FROM ROADWAY AND AIRFIELD PAVEMENTS | |
| 11 AF ETL 97-18 | EN-GUIDE SPECIFICATION FOR AIRFIELD AND ROADWAY MARKING | |
| 11 AF ETL 97-2 | EN-MAINTENANCE AND REPAIR OF RIGID AIRFIELD PAVEMENT SURFACES JOINTS AND CRACKS |


